1. All capacity of the load bank
• Diesel Generator test and Commissioning
• UPS test and Commissioning
2. Liquid cool heater
• Water cool chiller test and commissioning
• Cooling tower test and commissioning
• Heat exchanger test and commissioning
3. Air-cooled heater ( Data Hall Cooling system testing)
• CRAH
• Fan wall Unit
4. Chill water piping flushing pump ( During construction work)